Airport Cargo Warehouse Groundwork Dec 2024
Before
After
Slab breakout and Excavation
New Reinforced Concrete Pits x 2 and Floor Slab Repair

Loading Dock Excavation and shuttering
Completed Dock pit

Enfield Warehouse floor slab
removal and repair.
Install of drainage in the floor slab connected to
mains outside

Barking Warehouse Groundwork
EV charging points, HGV tarmac repair, electric
ducts and foundations for electric gates, kerbs and block paving


|